Install Process
The installation process of the FODS Trackout Control System is simple and can be completed without heavy equipment in as little as 30 minutes.
Make sure that you are aware of any underground utilities before installing anchors.
The FODS Trackout Control System should be positioned in alignment with the project's site management plan, industry standards, and the local council's erosion and sediment control requirements.
Install In 30 Minutes
Step 1
Choose your construction entrance configuration.
Step 2
Use the Mat Moving Tool to pull the mats into place.
Step 3
Use anchors to secure the mats to the substrate.